Dam Construction
 

Dam construction

Water resources are considered to be of the most important national resources.  Proper use and management of these will ensure their continuation. Increase in population has increased the demand for agricultural products. Which in turn has increased the need  for water consumption.

For carrying out projects in a proper and logical fashion it is important to use the latest and the most advanced scientifically updated methods. Sazab Pardazan Consulting Engineering Company in this case has carried out a number of important projects.  It can provide potential finding & feasibility studies  of surface and underground  water resources,  planning and water economy, surface and underground water resource integration, River engineering, diversion structures & installations, flood flow control and river corrections.

For the purpose of  water control, water storage and  power generation, this company also can provide all engineering services regarding concrete, earth and rock filled dams design & construction, tunnel design & construction, also hydroelectric plants and  all related structures design planning & project supervision.

 Main projects in dam construction

 

 

Project title

client

Stage

1

Study & design of north of Songhor earth dam Kermanshah  province

Ministry of Agriculture

Under study

2

Study & design of multipurpose Dams Sultan Abad watershed, MIS

Khuzestan Natural Resources Organization

Under study

3

Study & design of multipurpose Dams Tang kerd watershed, Bagh Malek 

Khuzestan Natural Resources Organization

Under study

4

Study & design of multipurpose Dams  watershed Dareh-Gheer  Ramhormoz county

Khuzestan Natural Resources Organization

Under study

5

Study& design  of upper  Bahmanshi river dam

Khuzestan Water & power Authority

completed

6

Supervision of gallery linings repair of  Shahid Abaspour dam

Khuzestan Water & power Authority

completed

7

Study and design of flood control,  collection and storage dams  Ben  Rashid Ramhormoz county

Ministry of Agriculture

completed

8

Design of sediment collector Fajer dam Ramhormoz county

Ministry of Agriculture

completed

9

Study & design of diversion dam  Maydawood

Ministry of Agriculture

completed

10

Study, design  of Dareh- Anjirak dam Behbahan county

Ministry of Agriculture

completed

11

Supervision over geotechnical  operations of Dareh-  Anjirak dam Behbahan  county

Ministry of Agriculture

completed

12

Hydroelectric power plant studies Shivand IZeh county

Ministry of Agriculture

completed

13

Study of Kandac dam Haftgel

Ministry of Agriculture

completed

 

 

 

 
 