Studies, designing and supervising the construction of a multi-purpose earthen dam in Ramhormoz watershed...

Studies, designing and supervising the construction of a multi-purpose earthen dam in Ramhormoz watershed...


Project geographical position: Khuzestan province, Ramhormoz county, Do Koohak village
Project description:
The aim of the plan implementation is flood control and prevention of damage on the road's Bridge of Behbahan-Ramhormoz and water storage for changing dry farming lands into water culture areas.

General Specification Earthen dam with clay core
Height of foundation 18.5m The volume of storage m3 5200000 m3
Height of the base 17 m Flood drain system Natural spillway
The length of crest 212M Type of spillway Stepped spillway
The width of crest 7m The width of spillway 20m
The width of base 103 The depth of spillway 3m