Geotechnical engineering studies and design of passage of 16 inches and 32 inch gas pipelines from Ramshir Hddriver To Horizontal Drilling method

Geotechnical engineering studies and design of passage of 16 inches and 32 inch gas pipelines from Ramshir Hddriver To Horizontal Drilling method

Client: Ministry of Oil - National Iranian south Oil company
Project's Geographical location: Khalf Abad Bridge - Ramshir- Khuzestan

Project Discription:

This project has been implemented in order to study geotechnical engineering and design of passage of 32 and 1 6 inches pipelines from under the substrate of Ramshir River using the directional drilling method.
The engineering services provided in this project are as follows:
• Conducting field studies, identifying seasonal changes of river, obstacles, facilities and existing constraints.
• The topographic map of the region and the existing status of the lines
• Initial design of routes profile to cross the lines and compare them
• Check the selected profile to determine the coordinates of key points
• Drilling operations 10 borehole deep40 m during the selected profile
• The laboratory of Wu field tests and analysis of the results
• Computer computing, simulation of tunnel static using geotechnical results
• Designing 2 HDD drilling path with length of 1400 m in a way that the drilling operation is perfectly possible and the time and cost of operation in Is at least possible