Supervision of implementation of River flood control channel of Jarrahi River in Ramshir County
Client: Kouzestan Water and Power Authority Project's geographical location: Khuzestan province- Ramshir County Project description:
The main purpose of this project is to transfer the river outbreak of the steel with the Decharge 1400 m3/s, and the protection of irrigation and drainage network of Ramshir. In addition to increasing the cultivation and development of agriculture in the Ramshir area, this process enables the implementation of warm water fishes breeding projects, the modern network of Ramshir irrigation and the protection of suburban villages from flood influx. The implementation of project supervision activities, which is responsible for consulting engineers of the water maker Engineering Company, is as follows: Construction of Perverted dam on the Surgical river in order to supply the level of water surface required to dewatering irrigation networks as well as diversion flood River surgery to the flood channel. Construction of the flood canal to transfer and drain the river flood of surgery and transfer it to Shadegan wetland in order to protect irrigation and drainage networks. Construction of fuse protection plates from irrigation and drainage networks Construction of the plate fuse on the right shore of Diversion dam reservoir in order to transfer River flood from the site of Perverted Dam and its evacuation in post and windy lands in West Ramshir area * Construction of irrigation and drainage network at the sidelines of the Steel river at a level equivalent to 19000 hectares